C0900 BMW Fault Code
Check C0900 OBD Fault Code ReasonVehicle Speed Sensor (VSS) Intermittent Indicates the powertrain control module (PCM) detected an error in the vehicle speed information. Vehicle speed data is received from either the vehicle speed sensor (VSS), transfer case speed sensor (TCSS), anti-lock brake system (ABS) control module, generic electronic module (GEM), or central timer module (CTM). This DTC is set the same way as C0900. However, it is intended to flash the transmission control indicator lamp (TCIL) for first time VSS circuit error/malfunctions. Refer to possible causes for C0900
C0900 Code Symptoms :
The scent may C0900 signal oil or coolant leaking from their normally closed-loop systems, or it may indicate dangerous exhaust gases invading your car's interior. Car and truck exhaust contains toxic gases such C0900, so if the inside of your car as if you were standing behind your car, get out and get it fixed.
Fight the urge to take a little nap first. So sleepy. That's the carbon monoxide talking, friends. At least open a window on your way to the shop.
Diagnosis And Repairing C0900
C0900 the main thing to check is to verify the operation of the VCT solenoid. You're looking for a sticking or stuck VCt solenoid valve caused by contamination. Refer to vehicle specific repair manual to perform component tests for the VCT unit.
How to fix C0900 code ?
- Clogged or faulty fuel injector (s)
- EVAP canister or fuel tank leaks
- Faulty front heated oxygen sensor
- Open or short in the VCT circuit
Circuit High Input codes like C0900 are mostly caused by defective alternators that develop excessive voltages, although there may be other causes as well, such as short circuits that 'leak' current into a particular system from other, unrelated systems that work on higher voltages. Note that in the case of short circuits that leak power into a control circuit, there is likely to be other, seemingly unrelated trouble codes present along with the code(s) being investigated. Diagnosing a 'high input' code will always involve a thorough testing of the charging system as a first step, followed by measures to isolate the system from all other possible sources of power during resistance, continuity, and reference voltage tests.